Skip to main content

The WTIV is designed for installation and maintenance of floating- as well as bottom-fixed wind turbine generators offshore.

«OWS Installer», a state-of-the-art wind turbine installation vessel (WTIV) design for installation of present and future generation (22MW+) floating- and bottom-fixed wind turbine generators at offshore location.

“OWS Installer”

Installation of fully assembled WTG on top of TLP substructure.

Installation of fully assembled WTG on top of TLP substructure.

“OWS Installer”

“OWS Installer“ main particulars
Loa:

158 m

Beam:

101 m

Deck area:

13.380 m²

Deck area cargo:

11.000 m²

POB:

140 men

Generator engines: 8 x 5.6 MW =

44,8 MW

Energy Storage System (ESS): 2 x 2 MWh =

4 MWh

Azimuth Thrusters:

8 x 3,5 MW

Tunnel Thrusters:

2 x 3,5 MW

Station keeping:

DP III

Main Cranes:

2 x 2.500 T (5.000 T in tandem)

Handling crane:

80 T

W2W gangway