The OWS Substructure can be fabricated, loaded-out and transported in horizontal position.
Once in position, the horizontally floating OWS Substructure, is upended to a vertical position by water ballasting.
The skirt of the suction caisson will be fully embedded in the seabed by use of suction pumps. Solid ballast to be added in the open compartment on top of the caisson.
Pile or drag embedded anchors and hybrid mooring lines to be installed and pretensioned by temporary tensioner, alternatively by use of line tensioner on the OWS Substructure.